06.08.2004
At 16:18, a cable fault in Allertshausen paralysed the power supply in parts of the Lumda Valley. Most customers were able to be supplied with electricity again within a few minutes by switching over. Another cable fault in Allendorf caused the power supply to be interrupted in parts of Allendorf/Lumda and Londorf. Customers in the south of Allendorf had to wait the longest. Here, a faulty surge arrester caused a lengthy outage.
After localising the three faults in total, the power supply was restored to all customers from 20:48.